Winter electrical works and 2027 projects: preparation starts now

Winter electrical works and 2027 projects: preparation starts now

Preparation in November helps next year's project start with clear information. Winter work requires realistic scheduling, electrical safety and defined responsibilities. HeilAres' services cover solar parks, electrical works, BESS and qualified workforce rental.

Agree the actual work package

Separate design, supply, structure and module installation, DC and AC works, and testing. A large park's total capacity is not the same as one contractor's delivered scope.

At HeilAres' Risti reference, total park capacity is 244 MW and our scope is 80 MW. New quotations need the same transparency: which tasks are included and which remain other parties' responsibilities.

Separate weather-dependent and indoor work

Cold, moisture, slippery surfaces and short days affect installation. Cable handling and connections must follow manufacturer requirements; not every task can be performed at every temperature.

Switchgear work and preparation can continue indoors where conditions allow. Outdoor schedules need weather contingency, safe access and lighting.

Electrical safety and crew responsibilities

Before work begins, establish isolation arrangements, the work area, responsible persons and site safety procedures. Competence, induction and checks matter for both internal crews and rented specialists.

HeilAres' electrical works MTR registration is TEL005181. Workforce rental can support agreed packages, but site management, electrical responsibility and inspection must be clearly allocated in the contract.

Plan handover from the start

Agree as-built drawings, labelling, measurement records, settings and operating instructions. When connecting new BESS or solar generation, also assess the existing electrical infrastructure.

To plan 2027 works, send HeilAres the location, scope, existing diagrams and target schedule. Deliveries, grid conditions and crew availability need project-specific confirmation rather than a universal completion promise.

Frequently asked questions

Planning next year's works?

Send HeilAres your site information and scope to discuss a realistic delivery plan.