Maapealne päikesepark — paneeliread silmapiirini

Solar panel services

Turnkey Solar Tracker Park, Ground-mounted Solar Park and Rooftop Solar Park solutions for B2B clients in Estonia, Latvia and across Europe.

01Sun-tracking systems

Solar Tracker Park

A Solar Tracker Park is a single-axis sun-tracking solar park that delivers up to 25% higher energy yield compared to fixed-tilt panels.

Solar Tracker Park with sun-tracking panel rows on a green field

Solar Tracker Park systems rotate the panels east to west during the day, following the sun. This keeps the panels at the optimal angle to solar irradiation from morning to evening and significantly increases annual energy yield compared to classic fixed ground-mount parks.

Solar Tracker Parks suit large open areas with stable ground and enough space to avoid shading between rows. HeilAres’ scope at the 244 MW Risti park is 80 MW. At the 10.94 MW Lielvārde project, we delivered pile driving, mounting structures and module installation as the main contractor.

Higher yield means faster payback and a better production profile across the day, which is especially valuable during peak electricity spot prices.

02Ground-mount solutions

Ground-mounted Solar Park

A ground-mount park is a land-based solar park that HeilAres designs and installs on a turnkey basis at commercial and industrial scale.

Ground-mounted solar park with long panel rows across a field

Ground-mount parks are ideal for agricultural land, brownfield sites and industrial plots with enough open area to install panels at the optimal tilt. HeilAres handles the installation — foundations, mounting structures, and panel and inverter installation.

We work on ground-mounted parks from a few MW to large-scale projects through clearly agreed work packages. HeilAres’ scope at the 77.5 MW Kirikmäe park was 32.7 MW. At the 72.5 MW Stelpe park, we installed 24 MW of mounting structures and modules and delivered 40 MW of DC and inverter works.

The strengths of a ground-mount park are easy maintenance, high yield and flexible scalability.

03Rooftop installations

Rooftop Solar Park

A rooftop park is a solar installation on industrial buildings, warehouses and commercial properties that HeilAres delivers on all roof types.

Rooftop parks suit both flat and pitched roofs — trapezoidal sheet, sandwich panel, bitumen and membrane roofs. Every project starts with a structural assessment to confirm the roof can safely carry the additional weight of panels and mounting structures.

HeilAres crews work to minimise disruption to the client's operations. We schedule around your production calendar, use safe lifting equipment and plan installation logistics so warehouse and factory operations keep running.

A rooftop park significantly reduces a company's electricity costs and CO2 footprint by using otherwise unused surface. On larger industrial buildings, rooftop capacity can reach several megawatts.

How we work

Simple and transparent — from first meeting to completed installation.

  1. 01

    Consultation

    We map your needs, site and energy potential.

  2. 02

    Engineering

    We design the technical solution and a precise quote.

  3. 03

    Installation

    We deliver the mounting, panels and DC works with the inverter.

Why HeilAres

Why HeilAres

A recognized partner for large-scale solar projects across Europe.

  • Megawatt-scale experience

    167.64 MW of documented work across reference projects. On large sites, we deliver clearly agreed work packages.

  • Turnkey delivery

    One partner for the whole installation — mounting, panels, DC and inverters.

  • Quick start

    Own crews and seasoned project managers ready to start work.

  • Tier-1 components

    We work only with top-grade panels and inverters.

  • Recognized competence

    Electrical work is carried out by a team with the relevant competence and MTR registration.

    MTR: TEL005181
FAQ

Frequently asked questions

Everything you need to know about HeilAres solar parks.

Ready to start your project?

Request a quote — we reply within 24 hours.