How long does utility-scale solar park construction take?

A utility-scale solar project can span several months. Duration depends on permits, grid connection, procurement, weather and agreed scope; signing the contract does not always mark the start of construction.
Phases and their typical duration
Engineering and permitting duration depends on site data, studies and approvals.
Procurement depends on equipment and confirmed supplier lead times. Phases may overlap and their durations cannot simply be added together.
Installation time depends on scope, soil, weather, crews and grid connection. A capacity in MW does not determine a universal construction duration.
Testing, commissioning and handover are scheduled according to project and grid operator requirements.
Main causes of delay
Supply delays may affect schedules. Depending on the project, confirmed lead times, potential alternative suppliers and time buffers can mitigate risk.
Extended permitting, persistent bad weather and grid interconnection slippage are the next main risks. A realistic schedule and clear communication with the local grid operator reduce these substantially.