Industrial BESS containers, electrical infrastructure and a solar park in Northern Europe

Battery storage and BESS solutions

Store energy, balance consumption and use your energy infrastructure more efficiently.

Project-specific energy storage solutions for solar parks, businesses and industrial sites in Estonia and Europe.

See how it works
Energy storageBESSSolar energyElectrical infrastructure
ENERGY STORAGE

What is BESS?

BESS, or Battery Energy Storage System, stores electrical energy for use when it is needed most.

BESS can be integrated with a solar park, a company electrical system or other energy infrastructure.

Storage is not only about holding energy; it makes the whole energy system more flexible and controllable.

Generation
BESS
Consumption / grid
BESS BENEFITS

Why add battery storage to your energy system?

01

Store generated energy

Store energy when generation exceeds current demand and use it later.

02

Balance generation and demand

Battery storage helps align energy generation with consumption.

03

Manage peak loads

Use stored energy during peak-demand periods to manage system load.

04

Integrate more renewable energy

BESS makes solar generation more flexible and controllable.

05

Optimise energy use

Store and use energy according to the site load profile and system objectives.

06

Prepare for the future

Storage adds flexibility and allows the infrastructure to evolve when needed.

APPLICATIONS

Battery storage for different energy users

Solar parks

Store solar generation and make production more flexible.

Industry

Manage large loads and optimise energy use based on the actual consumption profile.

Commercial buildings

Integrate storage with existing infrastructure and use generated or stored energy more flexibly.

Energy projects

BESS can form part of a wider renewable energy and grid project.

SOLAR PARK + BESS

Solar park and battery storage as one system

A solar park generates energy when sunlight is available, while demand may occur at a different time. Battery storage allows part of the generated energy to be stored and used later.

HeilAres can combine solar generation and battery storage into one integrated energy solution.

Solar park
Inverter
BESS
Consumption / grid

The right solution depends on generation, consumption, grid connection and project objectives.

Explore solar park solutions
PROJECT-SPECIFIC SIZING

Battery storage must fit the project, not the other way around

Every energy storage project is different. Selecting the right BESS requires consideration of consumption, generation profile, grid connection, required power, storage capacity and intended use.

That is why HeilAres does not offer one standard battery system for everyone.

The solution is selected according to the technical needs of the project.

Consumption
Generation
Grid connection
Power
Storage capacity
BESS solution
COMPLETE SOLUTION

A complete battery storage solution

Battery system

A battery system selected for the project’s energy storage needs.

Inverters and converters

Equipment required to control energy flows and system operation.

Control system

Control and optimisation according to the project objectives.

Electrical installation

Cabling, switchboards, protection systems and required electrical connections.

Monitoring

Monitoring system operation and using data to control it.

Grid connection

A solution matched to the site grid connection and technical conditions.

BESS AND ELECTRICAL WORKS

BESS also requires a professional electrical solution

Battery storage is not a standalone device. It must be integrated with the site electrical system, inverters, protection systems, cabling and grid connection.

HeilAres can connect the electrical side of a BESS project with other energy solutions.

MTR TEL005181

HeilAres electrical works registration in the Estonian register of economic activities.

Explore electrical works
SAFETY AND RELIABILITY

Safety and reliability are integral to BESS

Battery storage systems require consideration of the complete technical architecture, electrical safety, temperature conditions, protection systems and fire safety.

Design and installation must account for the specific site, selected technology and applicable technical requirements.

Electrical safety
Temperature conditions
Protection systems
Fire safety
FUTURE-READY ENERGY INFRASTRUCTURE

Plan your energy infrastructure for the next stage

Energy needs change. Future additions may include new solar parks, EV chargers, production equipment, storage or other high-power consumers.

Energy infrastructure should therefore be planned with possible future expansion in mind.

Today
Solar energy
Next stage
Solar energy + BESS
Future
Solar energy + BESS + EV + industrial loads
HOW WE WORK

From requirements to commissioning

01

Requirements mapping

We analyse the site, consumption, generation, grid connection and project objective.

02

Technical solution

We develop a suitable storage solution and define the required scope.

03

Installation and integration

We install and connect the system and coordinate integration with the site infrastructure.

04

Commissioning and handover

We verify operation, complete the required settings and hand over the solution.

WHY HEILARES

Why choose HeilAres as your battery storage partner?

A project-specific, integrated view connects energy storage with solar energy and professional electrical works.

  • Renewable energy experience

    HeilAres core business is connected with renewable and solar energy projects.

  • Integrated solution

    Battery storage can be combined with solar parks and electrical works.

  • Project-specific approach

    The solution is selected according to the needs of the specific site.

  • Electrical capability

    The electrical side of storage can be connected with HeilAres electrical works capability.

  • Estonia and Europe

    Projects can be delivered in Estonia and elsewhere in Europe according to their scale and needs.

FAQ

Frequently asked questions about BESS solutions

Essential information about planning, integrating and using battery storage.

Does your energy infrastructure need battery storage?

Send us the key project details and we will review which energy storage solution may suit your site.

Contact us