BESS energy storage

Valga Industrial Energy Storage KSTAR BluePulse

An industrial KSTAR BluePulse energy storage system was built for a site in Valga.

Storage capacity
409.6 kWh
0.4096 MWh
Total inverter power
200 kW
Location
Valga, Estonia
Valga 409.6 kWh energy storage installation – view 1

Work delivered by HeilAres

  • Installed 4 KSTAR KAC50DP inverters, 50 kW each (200 kW in total).
  • Installed 4 KSTAR BC100DE battery units, 102.4 kWh each (409.6 kWh in total).
  • Built new cable routes.
  • Installed and connected power cables.
  • Connected the battery units to the inverters.
  • Connected the BMS and EMS systems.