BESS energy storage

Pärnu Hybrid Power Plant and Energy Storage

A hybrid power plant with an energy storage system was built on site.

Storage capacity
630 kWh
0.63 MWh
Total inverter power
480 kW
Location
Pärnu, Estonia
Pärnu 630 kWh energy storage installation – view 1

Work delivered by HeilAres

  • Installed 6 Deye SUN-80K-SG02HP3-EU-EM6 hybrid inverters, 80 kW each (480 kW in total).
  • Installed 6 BSL S205-10 LiFePO₄ battery systems, 105 kWh each (630 kWh in total).
  • Built cable routes and installed MCCMKF 4×70/35 power cable.
  • Installed a new JK-PEJ distribution board.
Pärnu 630 kWh energy storage installation – view 2Pärnu 630 kWh energy storage installation – view 3Pärnu 630 kWh energy storage installation – view 4