BESS energy storage
Pärnu Hybrid Power Plant
A hybrid power plant with an energy storage system was built on site.
- Storage capacity
- 1542 kWh
- 1.542 MWh
- Total inverter power
- 480 kW
- Location
- Pärnu, Estonia

Work delivered by HeilAres
- Installed 6 Deye SUN-80K-SG02HP3-EU-EM6 hybrid inverters, 80 kW each (480 kW in total).
- Installed 6 BSL S314-16 LiFePO₄ battery systems, 257 kWh each (1542 kWh in total).
- Built cable routes and installed AXCMK-HF C-Pro 4×50/16 power cable.
- Installed a new distribution board to connect and run the equipment.