BESS energy storage

Pärnu Hybrid Power Plant

A hybrid power plant with an energy storage system was built on site.

Storage capacity
105 kWh
0.105 MWh
Total inverter power
60 kW
Location
Pärnu, Estonia
Pärnu 105 kWh energy storage installation – view 1

Work delivered by HeilAres

  • Installed a 60 kW Deye hybrid inverter.
  • Installed a BSL S205-10 battery system with 105 kWh total capacity.
  • Installed and connected current transformers.
  • Installed, connected and configured a smart meter.
  • Connected all equipment and set it up.
Pärnu 105 kWh energy storage installation – view 2Pärnu 105 kWh energy storage installation – view 3