BESS energy storage

Märjamaa Hybrid Power Plant and Energy Storage

A hybrid power plant with an energy storage system was built on site.

Storage capacity
1260 kWh
1.26 MWh
Total inverter power
600 kW
Location
Märjamaa, Estonia
Märjamaa 1260 kWh energy storage installation – view 1

Work delivered by HeilAres

  • Installed 10 Deye hybrid inverters, 60 kW each (600 kW in total).
  • Installed 10 ESS-GRID battery systems, 126 kWh each (1260 kWh in total).
  • Built cable routes and installed AXCHK-HF C-Pro 4×95/29 power cable.